If you own a dwelling or flat, you must have.
Step 4.1 Initial verification, inspection and testing of the Installation:
Electrical installation Certificate.
Schedule of the inspection Generic Schedule of Test Result of each circuit.
If you own a dwelling or flat, you must have.
Step 1.4 Electrical Schedule & Electrical Estimate (quote).
If you own a dwelling or flat, you must have.
Step 1.3 Location: devices, sockets, lamps. Together with the owner on the paper copy of the plans. After Drawing in de AutoCAD of devices, sockets, lamps & make schedule devices.
WE ARE HERE TO LOOK AFTER YOUR SAFETY AT HOME
What you need to know to make your electrical installation.
You need pass the building control: Electrical Installation Certificate, or fire alarm system. (Electrical Wired or Rewiring). we are here to facilitate all of these
Note: we can help you meet your home insurance company basic requirements to enroll with them, also at the point of making a claim, you must have the requirements described below to confirm that your electrical installation complies With British Standard. give us a call if you require an estimate for a professional drawing as below
Each step is supported on the previous
electrify solutions.co.uk
Design Building Inspection Maintenance of Installations London
If you own a dwelling or flat, you must have.
Step 2.1 Design (drawing) calculation of each circuit: Where it will be clearly identified e.g. calculation, Disconnection time, voltage drop maximum demand ………To comply the new regulation BS 7671:2018
All inspections and testing are done with modern technology machines.We use the most modern software (generation) to fill electronic Electrical Certificates.
Minimum documentation that has to send electrical contractor for the owner attached with the electric estimate:
-Level 3 Award in Initial and Periodic Inspection and Testing of Electrical Installation, including 3-phase, (inspector).
-Level 3 Award in the Requirements for Electrical Installations BS 7671.- Public and products Liability (insurance).
- Public and products Liability (insurance).
If you own a dwelling or flat, you must have.
Step 1.1 Architectural drawing (AutoCAD) plan of the premises.
In the end the plan will be with these details.
If you own a dwelling or flat, you must have.
Step 3.1 Risk Assessment Form,
Method Statement for works
Risk Assessment.
Method Statements Checklist
Note: Must be check. Supply Characteristic & Earthing Arrangement, after this you can build the installation.
Copyright © 2002-2021 Th.es Enterprises ltd. All Rights Reserved
Comments:
Reason for Ze verify? Verify the existence of supply earth.
Why Ze when C.U has been changed must be test?
-Different P.D now protecting circuit, must be confirmed disconnection times can be met
-When we change new Consumer Unit, will not comply with the disconnection time & will jump the Protective Devices
-Risk of the electric shock
-If the test is unsatisfactory, the owner must be, call & send this document to the supplier, they are responsible for solving this.
Fire detection and Alarm System.
-It need drawing design.
-Separate Certificate.